Yaskawa Sigma-5 User Manual: MECHATROLINK-II Commands Instrukcja Użytkownika Strona 26

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 142
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 25
2.2 Operation Sequence for Managing Parameters Using a Controller
2-9
2
Operation Sequence
2.2 Operation Sequence for Managing Parameters Using a
Controller
When the parameters are managed by a controller, the parameters are automatically transmitted from the con-
troller to the SERVOPACK when the power is turned ON. Therefore, the settings of SERVOPACK do not
need to be changed when the SERVOPACK is replaced.
If the connection cannot be released normally, send DISCONNECT command for 2 or more communications cycles,
and then send CONNECT command.
Procedure Operation Command to Send
1 Turn on the control and main circuit power supplies. NOP
2 Reset the previous communications status.
DISCONNECT
*
3 Establish communications connection and starts WDT count. CONNECT
4 Check information such as device ID. ID_RD
5 Get device setting data such as parameters. PRM_RD, ADJ
6 Set the parameters required for device. PRM_WR
7 Enable the parameter settings (Setup). CONFIG
8 Turn the encoder power supply to the position data. SENS_ON
9 Turn the servo on. SV_ON
10 Start operation.
11 Turn the servo off. SV_OFF
12 Disconnect the communications connection. DISCONNECT
13 Turn the control and main circuit power supplies.
Przeglądanie stron 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 141 142

Komentarze do niniejszej Instrukcji

Brak uwag